欧洲风能协会:2024年欧洲风电场的电网接入挑战报告(英文版).pdf |
下载文档 |
资源简介
As things stand, securing access to the electricity grid is the number one bottleneck to deploying renewables at scale. Grid access starts with grid connection. Currently more than 500 GW of total wind capacity in Croatia, France, Germany, Ireland, Italy, Norway, Poland, Romania, Spain and the UK are waiting for grid connection assessment. The total standby capacity figure for Europe is much higher. This is not just due to grid saturation or lack of adequate planning up to 2050. Grid permitti
本文档仅能预览20页



